Structural Integrity Reserve Study (SIRS)
Structural Integrity Reserve Studies are now required on all residential buildings that are 3 stories or higher in height.
Florida Statutes on Reserve Study Requirements
2a. In addition to annual operating expenses, the budget must include reserve accounts for capital expenditures and deferred maintenance. These accounts must include, but are not limited to, roof replacement, building painting, and pavement resurfacing, regardless of the amount of deferred maintenance expense or replacement cost, and any other item that has a deferred maintenance expense or replacement cost that exceeds $25,000 or the inflation-adjusted amount determined by the division under subparagraph 6., whichever is greater. The amount to be reserved must be computed using a formula based upon estimated remaining useful life and estimated replacement cost or deferred maintenance expense of the reserve item. In a budget adopted by an association that is required to obtain a structural integrity reserve study, reserves must be maintained for the items identified in paragraph (g) for which the association is responsible pursuant to the declaration of condominium, and the reserve amount for such items must be based on the findings and recommendations of the association’s most recent structural integrity reserve study. If an association votes to terminate the condominium in accordance with s. 718.117, the members may vote to waive the maintenance of reserves recommended by the association’s most recent structural integrity reserve study. With respect to items for which an estimate of useful life is not readily ascertainable or with an estimated remaining useful life of greater than 25 years, an association is not required to reserve replacement costs for such items, but an association must reserve the amount of deferred maintenance expense, if any, which is recommended by the structural integrity reserve study for such items. The association may adjust replacement reserve assessments annually to take into account an inflation adjustment and any changes in estimates or extension of the useful life of a reserve item caused by deferred maintenance.
b. The members of a unit-owner-controlled association may determine, by a majority vote of the total voting interests of the association, to provide no reserves or less reserves than required by this subsection. For a budget adopted on or after December 31, 2024, the members of a unit-owner-controlled association that must obtain a structural integrity reserve study may not determine to provide no reserves or less reserves than required by this subsection for items listed in paragraph (g), except that members of an association operating a multicondominium may determine to provide no reserves or less reserves than required by this subsection if an alternative funding method has been approved by the division.
c.(I) Reserves for the items listed in paragraph (g) may be funded by regular assessments, special assessments, lines of credit, or loans. A special assessment, a line of credit, or a loan under this sub-subparagraph requires the approval of a majority vote of the total voting interests of the association.
(II) A unit-owner-controlled association that must have a structural integrity reserve study may secure a line of credit or a loan to fund capital expenses required by a milestone inspection under s. 553.899 or a structural integrity reserve study. The line of credit or loan must be sufficient to fund the cumulative amount of any previously waived or unfunded portions of the reserve funding amount required by this paragraph and the most recent structural integrity reserve study. Funding from the line of credit or loan must be immediately available for access by the board to fund required repair, maintenance, or replacement expenses without further approval by the members of the association. A special assessment, a line of credit, or a loan secured under this sub-subparagraph and related details must be included in the annual financial statement that is required under s. 718.111(13) to be delivered to unit owners and required under s. 718.503 to be provided to prospective purchasers of a unit.
(III) This sub-subparagraph does not apply to associations controlled by a developer as defined in s. 718.103, an association in which the nondeveloper unit owners have been in control for less than 1 year, or an association controlled by one or more bulk assignees or bulk buyers as those terms are defined in s. 718.703.
d. If the local building official, as defined in s. 468.603, determines that the entire condominium building is uninhabitable due to a natural emergency, as defined in s. 252.34, the board may pause the contribution to its reserves or reduce reserve funding until the local building official determines that the condominium building is habitable. Any reserve account funds held by the association may be expended, pursuant to the board’s determination, to make the condominium building and its structures habitable. Upon the determination by the local building official that the condominium building is habitable, the association must immediately resume contributing funds to its reserves.
e. For a budget adopted on or before December 31, 2028, if the association has completed a milestone inspection pursuant to s. 553.899 within the previous 2 calendar years, the board, upon the approval of a majority of the total voting interests of the association, may temporarily pause, for a period of no more than two consecutive annual budgets, reserve fund contributions or reduce the amount of reserve funding for the purpose of funding repairs recommended by the milestone inspection. This sub-subparagraph does not apply to an association controlled by a developer as defined in s. 718.103, an association in which the nondeveloper unit owners have been in control for less than 1 year, or an association controlled by one or more bulk assignees or bulk buyers as those terms are defined in s. 718.703. An association that has paused reserve contributions under this subparagraph must have a structural integrity reserve study performed before the continuation of reserve contributions in order to determine the association’s reserve funding needs and to recommend a reserve funding plan.
f. Before turnover of control of an association by a developer to unit owners other than a developer under s. 718.301, the developer-controlled association may not vote to waive the reserves or reduce funding of the reserves. If a meeting of the unit owners has been called to determine whether to waive or reduce the funding of reserves and no such result is achieved or a quorum is not attained, the reserves included in the budget shall go into effect. After the turnover, the developer may vote its voting interest to waive or reduce the funding of reserves.
3. Reserve funds and any interest accruing thereon shall remain in the reserve account or accounts, and may be used only for authorized reserve expenditures unless their use for other purposes is approved in advance by a majority vote of all the total voting interests of the association. Before turnover of control of an association by a developer to unit owners other than the developer pursuant to s. 718.301, the developer-controlled association may not vote to use reserves for purposes other than those for which they were intended. For a budget adopted on or after December 31, 2024, members of a unit-owner-controlled association that must obtain a structural integrity reserve study may not vote to use reserve funds, or any interest accruing thereon, for any other purpose other than the replacement or deferred maintenance costs of the components listed in paragraph (g).
4. An association’s reserve accounts may be pooled for two or more required components. Reserve funding for components listed in paragraph (g) may only be pooled with other components listed in paragraph (g). The reserve funding indicated in the proposed annual budget must be sufficient to ensure that available funds meet or exceed projected expenses for all components in the reserve pool based on the reserve funding plan or schedule of the most recent structural integrity reserve study. A vote of the members is not required for the board to change the accounting method for reserves to a pooling accounting method or a straight-line accounting method.
5. The only voting interests that are eligible to vote on questions that involve waiving or reducing the funding of reserves, or using existing reserve funds for purposes other than purposes for which the reserves were intended, are the voting interests of the units subject to assessment to fund the reserves in question. Proxy questions relating to waiving or reducing the funding of reserves or using existing reserve funds for purposes other than purposes for which the reserves were intended must contain the following statement in capitalized, bold letters in a font size larger than any other used on the face of the proxy ballot:
WAIVING OF RESERVES, IN WHOLE OR IN PART, OR ALLOWING ALTERNATIVE USES OF EXISTING RESERVES MAY RESULT IN UNIT OWNER LIABILITY FOR PAYMENT OF UNANTICIPATED SPECIAL ASSESSMENTS REGARDING THOSE ITEMS.
6. The division shall annually adjust for inflation, based on the Consumer Price Index for All Urban Consumers released in January of each year, the minimum $25,000 threshold amount for required reserves. By February 1, 2026, and annually thereafter, the division must conspicuously post on its website the inflation-adjusted minimum threshold amount for required reserves.
(g) Structural integrity reserve study.—
1. A residential condominium association must have a structural integrity reserve study completed at least every 10 years after the condominium’s creation for each building on the condominium property that is three habitable stories or higher in height, as determined by the Florida Building Code, which includes, at a minimum, a study of the following items as related to the structural integrity and safety of the building:
a. Roof.
b. Structure, including load-bearing walls and other primary structural members and primary structural systems as those terms are defined in s. 627.706.
c. Fireproofing and fire protection systems.
d. Plumbing.
e. Electrical systems.
f. Waterproofing and exterior painting.
g. Windows and exterior doors.
h. Any other item that has a deferred maintenance expense or replacement cost that exceeds $25,000 or the inflation-adjusted amount determined by the division under subparagraph (f)6., whichever is greater, and the failure to replace or maintain such item negatively affects the items listed in sub-subparagraphs a.-g., as determined by the visual inspection portion of the structural integrity reserve study.
2. A structural integrity reserve study is based on a visual inspection of the condominium property.
3.a. A structural integrity reserve study, including the visual inspection portion of the structural integrity reserve study, must be performed or verified by an engineer licensed under chapter 471, an architect licensed under chapter 481, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts.
b. Any design professional as defined in s. 558.002 or any contractor licensed under chapter 489 who bids to perform a structural integrity reserve study must disclose in writing to the association his or her intent to bid on any services related to any maintenance, repair, or replacement that may be recommended by the structural integrity reserve study. Any design professional as defined in s. 558.002 or contractor licensed under chapter 489 who submits a bid to the association for performing any services recommended by the structural integrity reserve study may not have an interest, directly or indirectly, in the firm or entity providing the association’s structural integrity reserve study or be a relative of any person having a direct or indirect interest in such firm, unless such relationship is disclosed to the association in writing. As used in this section, the term “relative” means a relative within the third degree of consanguinity by blood or marriage. A contract for services is voidable and terminates upon the association filing a written notice terminating the contract if the design professional or licensed contractor failed to provide the written disclosure of the interests or relationships required under this paragraph. A design professional or licensed contractor may be subject to discipline under the applicable practice act for his or her profession for failure to provide the written disclosure of the interests or relationships required under this paragraph.
4.a. At a minimum, a structural integrity reserve study must identify each item of the condominium property being visually inspected, state the estimated remaining useful life and the estimated replacement cost or deferred maintenance expense of each item of the condominium property being visually inspected, and provide a reserve funding plan or schedule with a recommended annual reserve amount that achieves the estimated replacement cost or deferred maintenance expense of each item of condominium property being visually inspected by the end of the estimated remaining useful life of the item. At a minimum, the structural integrity reserve study must include a recommendation for a reserve funding schedule based on a baseline funding plan that provides a reserve funding goal in which the reserve funding for each budget year is sufficient to maintain the reserve cash balance above zero. The study may recommend other types of reserve funding schedules, provided that each recommended schedule is sufficient to meet the association’s maintenance obligation.
b. The structural integrity reserve study may recommend that reserves do not need to be maintained for any item for which an estimate of useful life and an estimate of replacement cost cannot be determined, or the study may recommend a deferred maintenance expense amount for such item. The structural integrity reserve study may recommend that reserves for replacement costs do not need to be maintained for any item with an estimated remaining useful life of greater than 25 years, but the study may recommend a deferred maintenance expense amount for such item. If the structural integrity reserve study recommends reserves for any item for which reserves are not required under this paragraph, the amount of the recommended reserves for such item must be separately identified in the structural integrity reserve study as an item for which reserves are not required under this paragraph.
c. The structural integrity reserve study must take into consideration the funding method or methods used by the association to fund its maintenance and reserve funding obligations through regular assessments, special assessments, lines of credit, or loans. If the structural integrity reserve study is performed before the association has approved a special assessment or secured a line of credit or a loan, the structural integrity reserve study must be updated to reflect the funding method selected by the association and its effect on the reserve funding schedule, including any anticipated change in the amount of regular assessments. The structural integrity reserve study may be updated to reflect any changes to the useful life of the reserve items after such items are repaired or replaced and the effect such repair or replacement will have on the reserve funding schedule. The association must obtain an updated structural integrity reserve study before adopting any budget in which the reserve funding from regular assessments, special assessments, lines of credit, or loans does not align with the funding plan from the most recent version of the structural integrity reserve study.
5. This paragraph does not apply to buildings less than three stories in height; single-family, two-family, three-family, or four-family dwellings with three or fewer habitable stories above ground; any portion or component of a building that has not been submitted to the condominium form of ownership; or any portion or component of a building that is maintained by a party other than the association.
6. Before a developer turns over control of an association to unit owners other than the developer, the developer must have a turnover inspection report in compliance with s. 718.301(4)(p) and (q) for each building on the condominium property that is three stories or higher in height.
7. Associations existing on or before July 1, 2022, which are controlled by unit owners other than the developer, must have a structural integrity reserve study completed by December 31, 2025, for each building on the condominium property that is three stories or higher in height. An association that is required to complete a milestone inspection in accordance with s. 553.899 on or before December 31, 2026, may complete the structural integrity reserve study simultaneously with the milestone inspection. In no event may the structural integrity reserve study be completed after December 31, 2026.
8. If the milestone inspection required by s. 553.899, or an inspection completed for a similar local requirement, was performed within the past 5 years and meets the requirements of this paragraph, such inspection may be used in place of the visual inspection portion of the structural integrity reserve study.
9. If the association completes a milestone inspection required by s. 553.899, or an inspection completed for a similar local requirement, the association may delay performance of a required structural integrity reserve study for no more than the 2 consecutive budget years immediately following the milestone inspection in order to allow the association to focus its financial resources on completing the repair and maintenance recommendations of the milestone inspection.
10. If the officers or directors of an association willfully and knowingly fail to complete a structural integrity reserve study pursuant to this paragraph, such failure is a breach of an officer’s or a director’s fiduciary relationship to the unit owners under s. 718.111(1). An officer or a director of an association must sign an affidavit acknowledging receipt of the completed structural integrity reserve study.
11. Within 45 days after receiving the structural integrity reserve study, the association must distribute a copy of the study to each unit owner or deliver to each unit owner a notice that the completed study is available for inspection and copying upon a written request. Distribution of a copy of the study or notice must be made by United States mail or personal delivery to the mailing address, property address, or any other address of the owner provided to fulfill the association’s notice requirements under this chapter, or by electronic transmission to the e-mail address or facsimile number provided to fulfill the association’s notice requirements to unit owners who previously consented to receive notice by electronic transmission.
12. Within 45 days after receiving the structural integrity reserve study, the association must provide the division with a statement indicating that the study was completed and that the association provided or made available such study to each unit owner in accordance with this section. The statement must be provided to the division in the manner established by the division using a form posted on the division’s website.
13. The division shall adopt by rule the form for the structural integrity reserve study in coordination with the Florida Building Commission.
LAST REVISED: JANUARY 2026